|
|
ProductBrief: Junction Box SS5 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Wheel Shape Load C NQ2 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Wheel Shape Load NQ3~5 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Indicator THW-501 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Crane Load Cell NY3 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Crane Load Cell NY5 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Crane Load Cel NS1,2,4 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Column Type Load NC1 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Column Type Load NC2 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Double Shear Beam ND2 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Double Shear Beam ND7 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Shear Beam Load NB5 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Shear Beam Load NB9 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Single Point Load NA165 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: Indicator THW-101 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief:
Single Point Load Cell NA12,NA13 Single Point Load Cell NA12,NA13 |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief:
Product Model: THC INDICATOR
*1/30,000 display resolution (Internal resolution 1/1,000,000)
*Kilogram(kg) and pound(g) weighing modes
*LCD display with backlight http://www.mavincn.com/ |
|
|
http://www.mavincn.com/ - PrieviewCard |
|
|
ProductBrief: it is well known that prior to the construction of double-wall corrugated pipe, you need to prepare materials, and make security work, to fence the roadbed side slope protection, prevent stones from falling objects hurt.
Small series to introduce you below what are the principles of construction of double-wall corrugated pipe.
1, double-wall corrugated pipe project with construction, but should conform to the General drainage pipe with Groove design, construction of the relevant provisions.
2, double wall corrugated pipe line laying, the use of flexible joint line laying, relative angle of double wall corrugated pipe for each undertaking normally not greater than 1.5 . |
|
|
http://www.shandonghaochen.com - PrieviewCard |
|
|
ProductBrief: PE gas pipeline could reach the required service life is a key factor is the quality of laying.
Prior to construction, we also need to make corresponding preparations, below we will talk about getting ready for a PE gas pipe construction matters, interested friends to look at it.
1, preparing the appropriate construction equipment;
2, induction training for operatives, training qualified before construction;
3, you should familiarize yourself with before construction, understanding construction drawings;
4, pipes, pipe fittings according to the standards for acceptance. PE gas pipe has several unique properties that make pipe |
|
|
http://www.shandonghaochen.com - PrieviewCard |
|
|
ProductBrief: using pipe friends should understand that in winter is relatively cold, used in such an environment is easier to frost-crack, this requires us to carry out thermal insulation, the insulation material when bonding, surface of the pipe must be cleaned debris, dirt, grease, to ensure the glue bonding results.
Here for you a little description of the insulation measures:
1, mortar shell of insulation jobs, winter when pipes to freeze measures. 2, pipe and equipment insulation should be in qualifying corrosion and hydraulic pressure test can be carried out, if you need to do first insulation layer, and weld the joints of the pipes should be set aside, |
|
|
http://www.shandonghaochen.com - PrieviewCard |
|
You may be interested in the company
You may be interested in the products |