the same conditions and building structure, the site for ground handling in Harbin example; all three units, thirty second floor, each for the twelve, the total area of about 3.2 million square meters.
1 with fine aggregate concrete pumping staffing is as follows:
Fine Stone Concrete Pump Operator 1, 2 sets of mixer operation for the 2 cement, sand and gravel 2 to clear the ground 2, pour 2, 4 Calibrating the ground, totaling 15 people.
Typically, the transport 12 cubic meters per hour (theoretical pump delivery volume of 20 cubic meters) 12 cubic meters per day × 8 hours = 96 cubic meters, construction of a thickness of 5-6 cm, construction of 1920 square meters per day, 128 square meters per capita, the overall project needs 17 days. Wages per person per day calculated at 80 15 × 17 × 80 = 20400 元
2 Hoist transport staffing is as follows:
2 sets of mixer operator, for cement 2 people, 2 of sand and gravel, transportation 8, clean-up 2, 4 casting, surface evenness 2, Total 22.
general each elevator can take two vehicles, the lower 6-minute, high-level delivery of the first 12 minutes 0.06 cubic meters per vehicle on average 6 times per hour of 12 transport vehicles, 8 were divided into 4 groups calculation, 12 × 0.06 × 8 × 4 = 23 cubic meters, the thickness of 5-6 cm, about 460 square meters per day, the whole project needs 21 square meters per person for 70 days. The same wage by 80 yuan per person per day calculated 22 × 70 × 80 = 123200 yuan.
Thus, this alone can save a project labor costs about 10 million. In today's high wages, workers shortage, Junik ( UNIQUE ) Fine Stone Concrete Pump undoubtedly improve the effectiveness of your ideal equipment.
Unique (UNIQUE) XBS Fine Stone Concrete Pump Technical Specifications
* centralized lubrication system, progressive one by one to each distribution system a lubricating oil supply point, and time, and quantity to the oil, saving equipment maintenance time, and grease consumption.
* for the all-hydraulic control system: pump, S pipe distribution of signals without the need for participation in the action, for the impact of small, low noise, significantly improve the hydraulic pump, hydraulic valve life.
* Full hydraulic control system eliminates the need for electrical signals to the control of the intermediate links, greatly improving the package of equipment to run the system reliability.
* centralized disc: the main hydraulic valve system, concentrated in a valve plate, reduce the cross-connecting pipe, the system more closely and reduce the chance of oil spills.