|
|
|
Company History |
| 2009 Po Maijishan Tunnel high-speed two-day renovation project 10kV Cable Joints Joints and indoor (outdoor) production |
| | 2009 Bao Tin Tunnel high-speed Maijishan 10kV cable fault testing and production of Cable Joints |
| | 2009 Weak high-speed packet Jiashan Tunnel West Construction |
| | 2009 Kang Nanyang Tunnel high-speed weak temporary construction |
| | 2008 Baotian Maijishan tunnel a high-speed Cable Joints 10kV substation and indoor (outdoor) terminal joint production |
| | 2008 Gansu Yellow 110kV substation reconstruction project For 35kV cable terminator production; |
| | 2008 West high-speed light engineering 10kV cable joints and cable safety testing services; |
| | 2008 Baotian 12.3 km high-speed uplink Maijishan tunnel construction and commissioning of strong power after the strong, weak rectification works; |
|
|
|
|